Work Package 3

 

This package will involve a thorough analysis of all the data collated in Work Packages 1 and 2. This will involve a detailed discussion of the implicit meaning of the aforementioned data collated in the earlier work packages.

 

 

 

3A) IN DEPTH ANALYSIS OF BIM ADOPTION IN INTERNATIONAL REGIONS.

Analyse a base of knowledge in respect to BIM adoption in international regions with particular focus on the enablers to support national implementation programmes.  This work package is connected to the Global BIM study data collection phase.

 

3B) IN DEPTH ANALYSIS FROM INDUSTRY CONSULTATION

Analyse a base of knowledge in respect to the use of BIM on Irish BIM projects and BIM adoption in Ireland generally, with a particular focus on identifying enablers for a successful national implementation programmes. This will be connected to data collected in work packages 1B, 1C, 1D, 2A and 2B.

 

3C) PROVIDE FURTHER ANALYSIS IN RESPECT TO THE EXTENT OF RESPONSE BY 3RD LEVEL INSTITUTES AND PRIVATE TRAINING BODIES TO DELIVERING BIM EDUCATION

Analyse a base of knowledge in respect to the extent of response by 3rd Level Institutes, and private training bodies, delivering BIM education and training programmes in the Irish market presently and determine if these offerings are improving the overall skill set of the Irish AEC sector in the use of BIM. As referred to in work package 2B (Systematic review of Higher Education Institutions (HEI) BIM programmes) there will be an ongoing review of HEIs throughout the course of the programme. 


  3D) IN-DEPTH ANALYSIS ON THE VALUE PROPOSITION FOR THE INCREASED ADOPTION OF BIM ON PUBLIC AEC PROJECTS

Carry out an in-depth analysis of the value proposition for the increased adoption of BIM on public AEC projects, with a particular focus on linking BIM to the wider strategic public policy direction of the Irish AEC Sector. This phase of analysis is based around the data collected for work package 2C.